The South East Cornerstone Public School Division Transportation Shop replaced the existing school bus maintenance facility. This building includes 3 drive through maintenance bays, one drive through wash bay and an exterior wash bay along with 1,500 sq.ft of office space and 2,100 sq.ft parts storage mezzanine. The design include a 12,000 sq.ft Butler pre-engineered building with a wood framed office area, under slab exhaust system and an exterior canopy feature.
Project Details:
Delivery Method: Design-BuildConstruction Type: New
Size: 12,000 sq.ft
Location: Weyburn, SK